Issue |
SICOT-J
Volume 5, 2019
|
|
---|---|---|
Article Number | 11 | |
Number of page(s) | 4 | |
Section | Hip | |
DOI | https://doi.org/10.1051/sicotj/2019008 | |
Published online | 01 April 2019 |
Case Report
The use of pararectus approach for Type 3B Paprosky acetabular defect with intrapelvic cup migration. Case report
1
Orthopedic Department, Assiut University Hospital, Assiut, Egypt
2
General Surgery Department, Assiut University Hospital, Assiut, Egypt
3
Orthopedic Department, Qena University Hospital, Qena, Egypt
* Corresponding author: khalifaahmed8486@yahoo.com
Received:
11
February
2018
Accepted:
28
February
2019
Case: A case of Type 3B Paprosky acetabular defect with intrapelvic cup migration where anterior column plating and cup extraction was done through an abdominal pararectus approach.
A male patient 63 years old reported progressive pain and walking disability after five years of cementless THR for right hip AVN.
CT pelvis showed loose intrapelvic migrated cup, extensive osteolytic acetabular defects, and pelvic discontinuity.
Pararectus approach was used to remove the cup and the head with concomitant plating of the anterior column
Conclusion: The pararectus approach is a valid option for intrapelvic cup extraction and pelvic discontinuity fixation.
Key words: Pararectus approach / Intrapelvic cup / Acetabular defect
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.