Issue |
SICOT-J
Volume 5, 2019
|
|
---|---|---|
Article Number | 33 | |
Number of page(s) | 8 | |
Section | Hip | |
DOI | https://doi.org/10.1051/sicotj/2019031 | |
Published online | 06 September 2019 |
Supplementary Material
Figure A.1. Forest Plot of risk ratio (RR) of intraoperative fractures with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.2. Forest Plot of risk ratio (RR) of periprosthetic fractures with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.3. Forest Plot of risk ratio (RR) of prosthetic dislocations with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.4. Forest Plot of risk ratio (RR) of wound infection with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.5. Forest Plot of risk ratio (RR) of surgical complications with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.6. Forest Plot of mean difference (MD) of operative time with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.7. Forest Plot of mean difference (MD) of hospital stay with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.8. Forest Plot of risk ratio (RR) of medical complications with 95% confidence interval, comparing between Thompson and Austin Moore groups.
Figure A.9. Forest Plot of risk ratio (RR) of mortality with 95% confidence interval, comparing between Thompson and Austin Moore groups.
(Access here)© The Authors, published by EDP Sciences, 2019
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.